Previous
Next
SIPI Reflooring
- The project consists of the abatement of all below ceiling asbestos in the student dorms, buildings #113 and #114 at Southwest Indian Polytechnic Institute.
- The abatement was followed by the demolition of all existing flooring which included removing carpet, VCT, and ceramic tile.
- The demolished flooring will be replaced by commercial-grade vinyl luxury tile and cove base.
- The total square footage of flooring to be installed is approximately 80,000.